New Hank Aaron State Trail connection

A new ramp has been opened connecting the 6th street bridge to the former train yard (called the Reed Street Yards) which is being redeveloped as an industrial park, specializing in companies focused on water. Here are pictures of the new ramp.

129

New ramp

Thus the east-bound trail rider would go south on the 6th street bridge at the eastern end of Canal Street. Then the rider would take the ramp down to the trail through the Reed Street Yards and continue east on the trail and along Freshwater Way and Pittsburgh Street.

130

6th Street bridge with new ramp in background (taken from Canal Street)

131

Ramp from 6th Street bridge